Photos: BBC Online
Saturday, May 12, 2012
Friday, May 11, 2012
My dissertation is out!
Finally, my book is out :)
I will start posting bits and pieces in this blog,
but if you feel the
urge to read the whole of it, let me know...
This dissertation is about the introduction of sustainability
partnerships into global environmental governance. Following their endorsement
by the United Nations in 2002 as a legitimate governance mechanism,
transnational partnerships have become mainstream and widespread across levels
and issue areas of environmental governance. While this shows their mimetic
success, this thesis reconsiders sustainability partnerships from the point of
view of their desirability as a way of governing human interactions with the
ecosystems of the planet. Accordingly, a critical methodology is employed,
combining post-structuralist discourse theory and ecocriticism, while using the
Global Sustainability Partnerships Database as a means to describe UN CSD
partnerships and to clarify and prioritise research questions. The discourses
analysed are privatisation of governance, sustainable development, and
democratic participation. A long-term historical study of these discourses
shows that these new, hybrid governance mechanisms fail to fulfil their promise
due to the discourses that sedimented into the logics of partnerships.
|
Wednesday, May 09, 2012
Lund-Copenhagen-Malmö
I'm at a workshop and visiting friends at Lund and Copenhagen. Both are pretty cities, but I think it is the Øresund Bridge, (the longest road and rail bridge in Europe, connecting Copenhagen with Malmö) that defines this area more than anything. It gives both cities a sense of connection and everybody seems to think it's cool. For me, it's most impressive to see the commitment to railroads. Here is some info on it:
It is occasionally referred to as the "Sound Bridge", using the historic English name for the strait.
In spite of two schedule setbacks – the discovery of 16 unexploded World War II bombs lying on the seafloor and an inadvertently skewed tunnel segment – the bridge-tunnel was finished three months ahead of schedule.
| At 7,845 m the bridge covers half the distance between Sweden and the Danish island of Amager, the border between the two countries being located 5.3 km from the Swedish end. The structure has a mass of 82,000 tonnes and supports two railway tracks beneath four road lanes in a horizontal girder extending along the entire length of the bridge. On both approaches to the three cable-stayed bridge sections, the girder is supported every 140 m by concrete piers. The two pairs of free-standing cable supporting towers are 204 m high allowing shipping 57 m of head room under the main span. Even so, most ship's captains prefer to pass through the unobstructed Drogden Strait above the Drogden Tunnel. Its 491 m cable-stayed main span is the longest of this type in the world. A girder and cable-stayed design was chosen to provide the rigidity necessary to carry heavy rail traffic, and also to resist large accumulations of ice. |
Name
In Denmark and Sweden, the bridge is most often referred to as Øresundsbroen and Öresundsbron, respectively. The bridge company itself insists on Oresundsbron, a compromise between the two languages. This symbolises a common cultural identity for the region, with some regular commuters considering themselves "Öresund citizens" once the Oresund Bridge was completed. Since the crossing is actually composed of a bridge, one artificial island, and a tunnel, it is sometimes called the "Öresund Link" or the "Öresund Connection" (Danish: Øresundsforbindelsen, Swedish: Öresundsförbindelsen).It is occasionally referred to as the "Sound Bridge", using the historic English name for the strait.
History
The construction of the Øresund Bridge began in 1995, and was finished 14 August 1999. Crown Prince Frederik of Denmark and Crown Princess Victoria of Sweden met midway across the bridge-tunnel to celebrate its completion.In spite of two schedule setbacks – the discovery of 16 unexploded World War II bombs lying on the seafloor and an inadvertently skewed tunnel segment – the bridge-tunnel was finished three months ahead of schedule.
Tuesday, May 08, 2012
Saturday, April 28, 2012
Subscribe to:
Posts (Atom)